Engr. Paul Abidoye is a highways engineer with over 8 experience in the engineering design
of roads and bridges. He actively participated in the engineering design of the following
projects: design of bridges on the dualization of Kano –Maiduguri road (section 1): design of
Wudil Flyover 1 & 2 (80m each), Wudil River Bridge (300m) and Rege River Bridge (60m),
Project manager for the engineering design of Arterial road and other access roads in phase
III, south of FCT Abuja. He was also an the supervision team of the dualization of Onitsha-
Owerri road and the rehabilitation of Onitsha-Enugu dual Carriageway. Paul is a registered
member of MNSE and COREN registered engineer.