Project Description

The project involved the design of the bridge and approach roads linking Shayangi to Koro in Kwara State. Cost, budget and financial controls, quality control during construction, supervision of construction and inspection, maintenance and repairs during performance stage, are factors considered in the choice of the structural system adopted. The system consists of a concrete box girder bridge supported on, and integral with, longitudinal concrete girders.

  • Client: Federal Ministry of Works, Mabuchi, Abuja.
  • Start Date: December 2012
  • Site Location: Pategi, Kwara State
  • Status: Completed
  • Budget: NGN 68, 000, 000,00